Table Of Content
- Construction begins on high-speed rail line from Los Angeles to Las Vegas
- Why lab designers should aim to ‘speak the language’ of scientists
- COLD STORAGE AND FOOD PROCESSING FACILITIES
- Development startup brings modular solution to hospitality industry
- CEG Construction design-builds new buildings across Greater Los Angeles
- Project conception and feasibility
- GIANTS 400 - BUILDING SECTOR AND SPECIALTY RANKINGS
- more ProConnect events scheduled for 2024, including all-new 'AEC Giants'

Any single structure that is larger than 25,000 square feet (2 320 square meters) must be registered as a separate project or treated as a separate building in a group certification approach. Some projects may be part of a large complex of buildings or a master planned development. Any project can follow the multitenant complex approach if it is part of a master plan development, regardless of whether the project is using the LEED Campus approach.
Construction begins on high-speed rail line from Los Angeles to Las Vegas
Building Design & Construction magazine is constantly at the forefront of this fast-moving and dynamic industry. With sound journalism and up-to-date news and reaction to the stories that are affecting your industry today, BDC magazine keeps you one step ahead. Carrier Johnson + Culture (CJ+C) has hired Pierluca “Luca” Maffey, International Assoc. Each day, our editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.
Why lab designers should aim to ‘speak the language’ of scientists

In countries such as Sweden and Saudi Arabia, waste-to-energy facilities are far more common than landfills. When strict air quality control measures are enforced, waste-to-energy can be a viable alternative to extracting fossil fuels to produce energy. The Energy and Atmosphere (EA) category approaches energy from a holistic perspective, addressing energy use reduction, energy-efficient design strategies, and renewable energy sources. The conservation and creative reuse of water are important because only 3% of Earth’s water is fresh water, and of that, slightly over two-thirds is trapped in glaciers1. Typically, most of a building’s water cycles through the building and then flows off-site as wastewater.
Timberlab to build its first mass timber manufacturing plant - Building Design + Construction
Timberlab to build its first mass timber manufacturing plant.
Posted: Sun, 17 Mar 2024 07:00:00 GMT [source]
COLD STORAGE AND FOOD PROCESSING FACILITIES
From 2000 to 2011, LEED projects in Seattle diverted an average of 90 percent of their construction waste from the landfill, resulting in 175,000 tons (158,757.3 tonnes) of waste diverted. If all newly constructed buildings achieved the 90 percent diversion rate demonstrated by Seattle’s 102 LEED projects, the result would be staggering. Source reduction appears at the top of the hierarchy because it avoids environmental harms throughout a material’s life cycle, from supply chain and use to recycling and waste disposal. Source reduction encourages the use of innovative construction strategies, such as prefabrication and designing to dimensional construction materials, thereby minimizing material cutoffs and inefficiencies.
In all cases, the origin must be accessible to all building users, and the walking or bicycling distance must not exceed the distance specified in the credit requirements. If actual resident count is not known, use a default equal to the number of bedrooms in the dwelling unit plus one, multiplied by the number of such dwelling units. For buildings with more unusual occupancy patterns, calculate the FTE building occupants based on a standard eight-hour occupancy period. If the land previously had buildings, then it is considered previously developed even if those buildings have since been torn down. Improved parks with manicured landscaping and constructed features like playgrounds (e.g., a city park) are considered previously developed.
Suffolk Construction establishes Suffolk Sustainability Group - Building Design + Construction
Suffolk Construction establishes Suffolk Sustainability Group.
Posted: Thu, 14 Dec 2023 08:00:00 GMT [source]
The Department of Building and Zoning Services is pleased and excited to partner with Fort Hayes Career Center. The goal of the partnership is to create opportunities for students entering the construction trades field. The students are exposed to trained professionals who previously worked in the industry and are now certified inspectors. In California, a proposed 500-mile (805-kilometer) rail line linking Los Angeles and San Francisco was approved by voters in 2008, but has been beset by rising costs and routing disputes.

Project conception and feasibility
The team-oriented approach also provides the collaborative effort necessary to evaluate the project’s objectives, assess schedules and analyze opportunities as the project progresses. As a team, no other group is better qualified to align the owner’s vision with the project’s goals and objectives. In essence, while “concept design” is an early, foundational stage in the design process, the term “design” encompasses the entire journey of bringing a project from an idea to fruition.
Through meticulous attention to detail and a dedication to craftsmanship, we aim to exceed expectations and create environments that inspire and uplift. Redefining the remodeling experience by bringing green principals and sustainable design to every project. We lessen the hassles and lower stress giving you peace of mind throughout the entire project while executing a unique vision that is built with integrity, innovation, and imagination. In essence, the outcome of the concept design phase is not just a report or a set of sketches.
more ProConnect events scheduled for 2024, including all-new 'AEC Giants'
Stan brings over 25 years of experience in complex projects for clients such as Sutter Health, Samsung, UHS, the University of California and the Mayo Clinic. A leader in Lean Design and Integrated Project Delivery (IPD), Stan believes in the power of respect for people and continuous improvement. His projects have been recognized for design excellence including National AIA and SCUP Honor Awards. Stan has served on professional and institutional boards including the Lean Construction Institute. Last but not least, your Design-Builder should have a long list of strong references and a portfolio of projects similar to yours.
The 48-story tower is located in the business district on Guangzhou’s Pazhou Island. The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico. Which explains a recent announcement that LACMA is partnering with the upcoming Las Vegas Museum of Art to share both expertise and, eventually, its collection.
Density a ratio of building coverage on a given parcel of land to the size of that parcel. Density can be measured using floor area ratio (FAR); dwelling units per acre (DU/acre) or dwelling units per hectare (DU/hectare); square feet of building area per acre of buildable land; or square meters of building area per hectare of buildable land. Refer to the minimum program requirements for information on how boundaries should be drawn for renovation and addition projects. Additionally, use the following guidance for treating energy systems in any project with mechanical systems.
No comments:
Post a Comment